4Panaou C,Bellino M,Greyling M.METSIM as a mass balancing tool for platinum-group metal concentrators[C].Computational analysis in hydromentallurgy 35 th annual Hydromentallurgy meeting.2005:145-156.
3Tie M, Yue H, Chai T Y. A Hybrid Intelligent Soft-sensor Model for Dynamic Particle Size Estimation in Grinding Circuits [J]. Lecture Notes in Computer Science (S0302-9743), 2005, 3498(3): 871-876.
4Radhakrishnan V. Model Based Supervisor Control of a Ball Mill Grinding Circuit [J]. Journal of Process Control (S0959-1524), 1999, 9(3): 195-211.
5Kis P, Mihalyko C, Lakatos B. Optimising Design of Continuous Grinding Mill-Classifier Systems [J]. Chemical Engineering and Processing (S0255-2701), 2005, 44(2): 273-277.
6Ramasamy M, Narayanan S, Rao C. Control of Ball Mill Ginding Circuit Using Model Predictive Control Scheme [J]. Journal of Process Control (S0959-1524), 2005, 15(3): 273-283.
7Rajamani K, Herbst J. Grinding Circuit Modeling and Dynamic Simulation [J]. Chemical Engineering Science (S0009-2509), 1991,46(3): 861-870.
8Durance M, Villeneuve J, et al. Computer Simulation of Mineral and Hydrometallurgical Processes, USIM PAC2, a Single Software from Design to Optimization [C]//Proc. Int. Symp. Modell. Simul. Control Hydrometall. Processes, Quebec City, Canada, 1993. Montreal: Canadian Institute of Mining, Metallurgy and Petroleum 1993: 109-121.
9Liu Y, Spencer S. Dynamic Simulation of Grinding Circuits [J]. Minerals Engineering (S0892-6875), 2004, 17(11): 1189-1198.
10Irannajad M, Farzanegan A, Razavian S. Spreadsheet-based Simulation of Closed Ball Milling Circuits [J]. Minerals Engineering (S0892-6875), 2006, 19(15): 1495-1504.