摘要 针对高水头条件下某水电站工程进水口闸门槽混凝土集中漏水的情况,分别介绍了实际施工过程中采用的各种堵漏处理方案及施工过程,重点阐述了采用封闭顶压+LW水溶性聚氨酯化学灌浆对闸门槽混凝土漏水的应急处理效果,为有效处理该类问题提供参考。 in a hydropower station ,the gate slot concrete of intake has leaked under the situation of high water head ,a variety of treatments applied during the actual construction process are introduced respectively in the paper firstly,then the authors mainly expound the et'feet of emergency treatment,the closed lop pressure + LW water-soluble polyurethane chemical grouting,which solves the concrete leakage preferably,providing references to deal with such a problem effectively.
出处 《资源环境与工程》 2013年第4期584-587,共4页 Resources Environment & Engineering
关键词 高水头 闸门槽混凝土 集中漏水 封闭顶压+LW水溶性聚氨酯化学灌浆 high head gate slol concrete centralized leakage closed top pressure + LW water-soluble polyurethanechemical grouting
  • 相关文献

参考文献2

共引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部