摘要
根据委托方提供的设计资料和现场踏勘的具体情况,对工程进行了风险评估,通过详细计算和论证分析,做出评价结论并提出相关施工注意事项和建议,以期指导实践。
The risk assessment of the project is according to the design information provided by the client and the specific circumstances of the scene. Through detailed calculations and validation analysis, we can have some conclusions and offer some construction notes and suggestions, so as to guide practice.
出处
《山西建筑》
2013年第33期143-144,共2页
Shanxi Architecture
关键词
已建涵洞
管道穿越
风险评估
culvert built, crossing pipeline, risk assessment