期刊文献+

隧道二次衬砌背后脱空的防治 被引量:9

Prevention and Remedy of Cavitations behind Secondary Lining of Tunnels
下载PDF
导出
摘要 文章介绍了隧道衬砌背后脱空治理的必要性及检测方法,进行了成因分析和对脱空的处理。结合工程实践经验从施工和管理角度提出了防治的具体措施,对施工中减小二衬脱空具有指导意义。 The paper presents the necessity of remedy of cavitations behind the liners of tunnels and the methods to detect the defects. The paper also presents analyses on the causes of cavitations and methods to remedy the cavitations. Concrete measures are proposed for remedying the cavitations from the viewpoints of construction and management in the light of engineering expe- rience, which may offer guidance for reducing cavitations in the secondary lining of tunnels during the construction of tunnels.
出处 《中国港湾建设》 2013年第5期62-64,共3页 China Harbour Engineering
关键词 铁路隧道 二衬脱空 成因 防治措施 railway tunnel cavitation in secondary lining cause prevention and remedy measures
  • 相关文献

参考文献6

  • 1赵勇.中国铁路隧道建设规划与挑战[R].北京:铁道部工程设计鉴定中心,2010.
  • 2新建高速铁路兰州至重庆线兰州至广元段时速200km(双层集装箱)客货共线电化铁路双线隧道复合式衬砌设计图[R].西安:中铁第一勘察设计院集团有限公司,2009.
  • 3TB10121-2007,铁路隧道监控量测技术规程[S].
  • 4TB10223-2004 Z341-2004.铁路隧道衬砌质量无损检测规程[S].[S].,..
  • 5新建高速铁路兰州至重庆线兰州至广元段时速200km(双层集装箱)客货共线电化铁路隧道防排水设计参考图[R].西安:中铁第一勘察设计院集团有限公司,2009.
  • 6铁道部建设管理司.铁路隧道防水板铺设工艺技术规定[s].2010.

共引文献69

同被引文献46

引证文献9

二级引证文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部