文章通过研究分析水库蓄水过程对坝上下游河段演变的影响,并根据汛末长江来水过程,对三峡枢纽汛末蓄水的起蓄时间、起蓄水位及下泄流量进行了研究,提出了合理的优化调度方案。该方案可降低三峡枢纽汛末蓄水对坝上回水变动区河段淤积的不利影响,提高对坝下河段浅滩的冲刷效果,并保证三峡水库按时蓄满。
Based on an analysis of the intluence of reservoir hlling upon the upper and lower reaches as well as the discharges at the end of flood season, this article studies the filling period, original water level and the amount of discharges of the Three Gorges Project at the end of flood season. In addition, this article puts forward scheduling optimization schemes, which is expected to minimize the impact of reservoir filling on backwater area deposition, maximize its scouring effect on downstream shoal as well as ensure the timely filling of the reservoir .
出处
《南通航运职业技术学院学报》
2013年第3期59-62,共4页
Journal of Nantong Vocational & Technical Shipping College
关键词
三峡枢纽
蓄水
长江航运
优化调度
Three Gorges Project
Filling
Yangtze River shipping
Scheduling optimization