期刊文献+

缺陷桩的旁孔透射波法检测分析原理 被引量:14

Analysis of Defects of Pile Shaft for Parallel Seismic Test
下载PDF
导出
摘要 以均质弹性地基中具有低速缺陷段的基桩为研究对象,利用基于Snell定律的射线理论,对旁孔中首至透射P波的时深关系推导了一套简化理论计算公式,并由此提出了采用旁孔透射波法检测分析桩身缺陷的方法.对饱和地基中具有低速缺陷段的基桩,采用轴对称有限元法模拟计算了旁孔透射波法测试信号,对其按上述方法分析推算桩身低速缺陷段的位置、长度和波速以及桩长,以检验本文方法的可靠性.结果表明,本文方法具有良好的实用潜力,值得开展进一步的验证和试用工作. Based on Snell's law for simplified pile-soil models, a series of formulae of time-versus-depth relations of the first-arrival of P wave in the parallel seismic test (PST) were derived and a reasonable method for determination of pile defects was proposed in this paper. An axisymmetric finite element model of a single defected pile in saturated soil was used to simulate the PST. The location, length and P-wave veloci- ty of the defect in the pile shaft as well as the pile length were analyzed with the method presented. The results proved the application potential of the method proposed this paper, which is worth of further verifi- cation by field tests.
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2013年第10期1562-1568,1579,共8页 Journal of Shanghai Jiaotong University
基金 国家自然科学基金项目(51178267) 交通运输部西部交通科技项目(20113182231390)资助
关键词 旁孔透射波法 桩身缺陷 简化计算模型 parallel seismic test pile defects simplified model
  • 相关文献

参考文献7

二级参考文献20

  • 1吴宝杰,杨桦,潘金炎.既有建筑物下基桩检测技术研究[J].工业建筑,2009,39(S1):768-770. 被引量:5
  • 2黄大治,陈龙珠.钢筋混凝土管桩反射波法的三维有限元分析[J].岩土力学,2005,26(5):803-808. 被引量:21
  • 3梁国钱,陈龙珠,吴世明.半无限体轴对称动力课题的一种边界处理方法[J].岩土工程学报,1995,17(3):19-25. 被引量:5
  • 4汤建新,黄大治.旁孔透射波法检测水泥搅拌桩质量的研究[J].中国市政工程,2006(6):83-85. 被引量:11
  • 5Olson L D, Liu M, Aouad M F. Borehole NDT Techniques for Unknown Subsurface Bridge Foundation Testing [J]. SPIE, 1996, 2946(10):10 - 16.
  • 6Controlling foundation length by the parallel seismic method [ OL]. http ://www. ginger - cebtp, com/vente/ CS97_SPL_uk. html. (in Chinese) ).
  • 7US Department of Transportation - Federal Highway Administration. Borehole nondestructive test methods: Parallel seismic [ OL ]. http ://www. cflhd, gov/agm/ engApplications/BfidgeSystemSubstructure/ 212BoreholeNondestMethods. htm.
  • 8Liao S T, Tong J H, Chen C H, et al. Numerical simulation and experimental study of Parallel Seismic test for piles [ J ]. International Journal of Solids and Structures ,2006,43 : 2 279 - 2 298.
  • 9罗騏先.桩基工程检测手册[M].北京:人民交通出版社,2003.
  • 10DAVIS A G EVANS J G HERTLEIN B H.Nondestructive evaluation of concrete radioactive waste tanks[J].Journal of Performance of Constructed Facilities,1997,11(11):161-167.

共引文献47

同被引文献77

引证文献14

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部