摘要 对影响软土盾构法隧道长期纵向沉降的主要因素进行了研究,并以已运营近40 a的上海打浦路隧道圆隧道纵向沉降变形长期观测结果,对该隧道的纵向长期变形形态、纵向差异变形曲率、隧道纵向变形与隧道渗漏的关系、圆隧道与竖井的差异沉降等进行了分析。研究显示,隧道的长期纵向变形受隧道周围水文地质条件、外部荷载、隧道自身的结构特点、隧道的渗漏水状态等条件的影响,总体上需要较长时间才能趋于稳定,且对周边环境变化的反应较为敏感。 The influence factors of longterm longitudinal settlement of the tunnel by soft soil shield method are analyzed.The longterm settlement & deformation observations have been acquired from Shanghai Dapu Rd.Tunnel operated for near 40 years including longitudinal long-term deformation shape,vertical differential deformation curvature,the relationship between longitudinal deformation and the tunnel leakage and the differential settlements of the round tunnel & the shaft.Results show that tunnel's longitudinal deformation has relationship with the hydrogeology and engineering geology,the external load on the tunnel lining,the structural characteristics of the tunnel and leakage of water status.As a whole,it generally takes a longer time to stabilize with being more sensitive to environmental changes.
作者 王莉
出处 《中国市政工程》 2013年第5期89-91,109-110,共3页 China Municipal Engineering
关键词 盾构隧道 纵向沉降 沉降 渗漏 shield tunnel longitudinal settlement settlement leakage
  • 相关文献

参考文献3

二级参考文献25

  • 1刘建航 侯学渊.盾构隧道[M].中国铁道出版社,1991.243-303.
  • 2姜启元.《越江隧道保护区域尺度范围的分析》研究报告[M].上海市隧道工程设计院,1993..
  • 3陆忠良 姜启元 等.上海地区隧道与地下工程抗震设计研究[M].上海市隧道工程设计院,1998..
  • 4姜启元.软土隧道圆形衬砌土压力反分析的应用[J].地下工程与隧道,1996,(1):7-14.
  • 5王如路 周贤浩 等.近年来上海地铁监护发现的问题及对策[A]..中国土木工程学会隧道及地下工程学会地下铁道专业委员会第十四届学术交流会论文集[C].,2001.239-242.
  • 6Mair R J, Taylor R N. Theme lecture: Bored tunneling in the urban environment [A]. Proceedings of the Fourteenth International Conference on Soil Mechanics and Foundation Engineering[C]. 1997. 2353-2385.
  • 7Shirlaw J N, Subsidence owing to tunneling II Evaluation of a prediction techniques: Discussion^1[J]. Canadian Geotechnical Journal, 1994, 31: 463-466.
  • 8Shirlaw J N. Observed and calculated pore pressures and deformations induced by an earth balance shield: Discussion^1 [J]. Canadian Geotechnical Journal, 1995, 32: 181-189.
  • 9Cooper M L, Chapman D N, Rogers C D, Chan A H. Movements in the piccadilly line tunnels due to the heathrow express construction[J]. Geotechnique, 2002, 52(4): 243-257.
  • 10Yi X, Rowe R, Lee K M. Observed and calculated pore pressure and deformations induced by an earth balance shield [J]. Canadian Geotechnical Journal, 1993, 30: 476-490.

共引文献183

同被引文献44

引证文献7

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部