摘要
介绍了秦山核电二期工程1、2号机组燃料装卸系统设备电气、机械部件改造情况及使用效果,其经验可供类似系统设备改造工程借鉴。
The paper introduces the transformation situations and application effects of electrical and machinery com- ponents of Unit 1 and Unit 2 fuel handling systems in Qinshan phase - II Nuclear power project, the experience from which can provide reference for transformation of similar systematic facilities.
出处
《起重运输机械》
2013年第10期96-98,共3页
Hoisting and Conveying Machinery
关键词
燃料装卸系统设备
改造
核电
fuel handling system
transformation
nuclear