公伯峡水电站左岸泄洪洞进水口高架门机安装基础稳定性分析

Analysis on Stability of Foundation for Installation of High Gantry Crane at Inlet of Flood Discharge Tunnel on Left Bank,Gongboxia Hydropower Project
下载PDF
导出
摘要 经公伯峡水电站左岸泄洪洞进水塔混凝土施工方案比较,采取在进口边坡高程1 981.0 m的宽马道上布置1台DMQ600A/30 t高架门机,满足了进水塔、贴坡及进水塔交通桥的施工要求。根据现场地质勘测以及对门机基础进行稳定分析计算,表明门机基础处于稳定状态。通过2 a多的运行,亦验证了门机基础处于稳定状态。 Through comparison with the construction scheme of concrete placement of intake tower of the flood discharge tunnel on left bank, Gonghoxia Hydropower Project, one high gantry crane of DMQ6OOA/30 t is provided on the wide berm at EL. 1981.0 m on the inlet slope. This installation satisfies construction requirements of intake tower, slope protection and access bridge of the intake tower. Through the site geological investigation, stability analysis and calculation on the foundation of the gantry crane, it shows that the gantry crane foundation is in stable condition. Meanwhile, more than 2a-year operation verifies the gantry crane foundation in the stable condition.
作者 韩俊萍 高雄
出处 《西北水电》 2013年第5期49-52,共4页 Northwest Hydropower
关键词 高架门机 基础 边坡支护 稳定分析 安全运行 high gantry crane foundation slope support stability analysis safety operation
  • 相关文献

参考文献5

  • 1DMQ600A/30t型高架门机安装图纸[S].浙江省东阳市:浙江省水电建筑机械有限公司,2010.
  • 2周氐,章定国,钮新强水工混凝土结构设计手册[M].北京:中国水利水电出版社,1999.
  • 3DL/T5353-2006,水电水利边坡工程设计规范[S].北京:中国电力出版社,2007.
  • 4陈祖煜,等.岩石边坡稳定分析[M].北京:中国水利水电出版社,2005.
  • 5张有天,周维垣.岩石高边坡的变形与稳定分析[M].北京:中国水利水电出版社,1999.