摘要
高压锅炉给水泵多采用高压电机。文章将简述高压锅炉给水泵高压电机的振动原因分析及处理方法和过程。进行现场测量试验、数据分析与故障诊断,通过检查得以证实设备故障振动原因。根据现场记录并结合相关软件进行分析,通过添加配重调整动平衡,最终实现平稳运行。文章给出了具体的处理方案,现场作了动平衡试验,为企业实际的生产运行提供理论依据,并达到安全生产的目的。
High pressure boiler feed pump with high-voltage motor.This article will briefly discuss that the high pressure boiler teed pumps'motor vibrated reason, Handling method and process.Field measurement experiment was carried out, Data analysis and fault diagnosis. It was verified by checking the equipment fault vibration reasons.According to the records and combined with related software for analysis. By adding weight adjustment of dynamic balance. Eventually run smoothly. The article gives the concrete treatment scheme, Field dynamic balance test, So as to provide a theoretical basis for enterprises to achieve safety and energy saving production operation.
出处
《广东化工》
CAS
2013年第20期56-57,共2页
Guangdong Chemical Industry
关键词
给水泵电机
振动
原因
处理
high-voltage motor of boiler feed pump
vibrate
reason
processing