摘要
根据焦化厂脱硫现状,对脱硫系统及相关工序的工艺流程进行优化,对相关设备进行改造,使脱硫工序的开工率大幅度提高,硫产量得到大幅度提升。
According to the present situation of desulfurization of coking plant, we on the desulfurization system and the process of optimization, transformation of related equipment, so that the desulfurization process operating rate is greatly improved, sulfur yield can be greatly improved.
出处
《广东化工》
CAS
2013年第20期130-131,127,共3页
Guangdong Chemical Industry
关键词
焦炉煤气脱硫
系统改造
系统堵塞
系统优化
the desulfurization ofcoke oven gas
system transformation
system blocking
system optimization