摘要
本文介绍了贵冶精矿库吊车梁预应力混凝土后张自锚施工过程 ,通过对传统工艺的改进 ,节约工程投资 ,加快施工工期。
This paper introduces the construction with self-anchor after tensioned method for crane beam prestressed concrete of concentrate storeroom in Guixi Smelter. The project investment was saved and constructing time was shorted due to changing the traditional process.
出处
《铜业工程》
CAS
2000年第4期22-23,31,共3页
Copper Engineering