摘要
利用计算机模拟研究了不同放矿口间距下的放矿过程。在经济分析的基础上,建立了放矿口间距的优选模型,并利用该模型得出某矿山Ⅲ采场最优的放矿口间距。
The ore-drawing courses under different ore-drawing-hole spacing are studied with computer simulation. On the base of economic analysis, the optimization model of ore-drawing-hole spacing is built, and with it the best spacing for the Ⅲ stope of some mine is obtained
出处
《河北冶金》
2000年第5期20-22,共3页
Hebei Metallurgy