简要介绍了宣钢选烧厂 2号 (8m2 )球团竖炉的建设及投产情况。该厂通过加大技术投入 ,强化内部管理 ,实现了当月投产 ,当月达产。
The aspect of building and commissioning of №2 pelletizing shaft furnace (8m2) in Xuangang were presented briefly.Through dopting the techenical measures and intensifying production management,the design capacity was attained at first month after its commissioning.