期刊文献+

金属矿山矿柱回采时爆破荷载下采空区的围岩稳定性 被引量:16

Surrounding rock stability of mined-out area under blast loading in metal mine pillar robbing
下载PDF
导出
摘要 以朝不楞矿区铁锌多金属矿山工程地质为依据,采用FLAC-3D软件及超声波测试,以岩体爆破损伤理论为基础,系统研究了多次爆破作用下井下分段回采巷道掘进时,回采巷道围岩损伤累计增长规律,并对尾砂胶结物充填相邻采空区下的矿柱回采进行了三维有限元数值模拟,分析了围岩爆破累计损伤和残留矿体矿柱回采及采空区稳定性。 By taking the engineering geology of the Fe-Zn polymetallic ore in Chaobuleng mine as an example, based on the blast damage theory of rock, the FLAC-3D software was adopted and ultrason- ic tests were carried out to systematically explore the cumulative damage development in the surround- ing rock of the re-exploited tunnel. In the above investigation, the surrounding rock was impacted by blasting for many times in the section excavation process. And the re-exploitation of the tiberium spike under the mined-out area adjacent to the re-exploited tunnel was numerically simulated. Thereby the stability of the surrounding rock of the mined-out area was analyzed. It is helpful for engineering application.
出处 《爆炸与冲击》 EI CAS CSCD 北大核心 2013年第4期344-350,共7页 Explosion and Shock Waves
基金 国家自然科学基金项目(51074085)~~
关键词 爆炸力学 围岩稳定性 FLAC-3D软件 矿柱回采 岩体累计损伤 声波测试 mechanics of explosion stability of surrounding rock FLAC-3D extraction cumulativedamage~ acoustic testing
  • 相关文献

参考文献12

二级参考文献37

共引文献326

同被引文献195

引证文献16

二级引证文献68

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部