期刊文献+

改建铁路干塘至武威南增建二线干塘地区方案研究 被引量:1

Research on the Second Gantang to Wuweinan Railway Line Construction Program in Gantang Area
下载PDF
导出
摘要 干塘站是包兰铁路与干武铁路的接轨站,担当客货列车的到发及通过作业,货场及专用线的取送调车作业以及武威至白银西方向列车的折角、补机作业。干武铁路增建二线工程设计中针对干塘地区的引入做了2个方案,分别为干塘站集中办理方案和乌兰敖包至小红山径直联络线方案,本次设计暂推荐干塘站集中办理方案。 Gantang station, as the junction station between Baotou-Lanzhou railway and Gantang-Wuweinan railway, un-dertakes missions like the departure and arrival of passenger and freight trains, delivery and shunting operation of freight yard and dedicated line, and the angular complement machine operating of Wuwei to Baiyin west trains. In the engineering of Gantang to Wuweinan construction of second-line, two programs were made for the introduction of the Gantang area. They are Gantang station centralized processing program and construction of Wulanaobao to Xiaohongshan straight contact line program. In the engineering we recommend Gantang station centralized processing program.
作者 姬烨
出处 《铁道建筑技术》 2013年第10期12-14,共3页 Railway Construction Technology
关键词 改建铁路 折角运输 集中办理 径直联络线 reconstructed railway angular operation centralized procession straight contact line
  • 相关文献

参考文献2

  • 1铁道第四勘察设计院.GB50091-2006铁路车站及枢纽设计规范[S].北京:中国计划出版社,2006.
  • 2铁路部科学研究院铁道建筑研究所.TB/T1407-1998列车牵引计算规程[S].北京:中国铁道出版社,1998:28-29.

共引文献5

同被引文献5

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部