水利水电工程招标管理问题及对策 被引量:2

Water Conservancy and Hydropower Project Bidding Management Problems and Countermeasures
下载PDF
导出
摘要 合同管理贯穿于水利水电工程项目的整个过程,是确保工程项目顺利运行的核心要素,水利水电工程合同管理的起点则是其招标工作。通过招标的方式,挑选出实力雄厚,能力卓越,各方面都比较优秀的承包商,从而保证工程项目的顺利开展。所以,招标工作准备、实施的好坏,直接关系到工程项目的工期、质量以及成本三大要素,由此可见,招标工作在整个建筑工程项目中是极为重要的。本文从水利水电工程招标的发展过程及现状展开论述,分别介绍了我国招标承包制的特点及其重大意义,招标的基本条件及要求,招标方式的选择等几个方面,总结出一系列招标面临的问题,最后针对这些问题提出相应的解决对策。 Contract management throughout the whole process of water conservancy and hydropower project, is a key element to ensure project run smoothly, the starting point of the water resources and hydropower engineering contract management is the bidding work. In the contractor by way of bidding, pick out the strength, ability is outstanding, all aspects are excellent contractors, to ensure the project smoothly. So, preparation, implementation of the bidding work of good or bad, directly related to the project time limit, quality and cost of the three elements, thus it can be seen, in the whole construction project bidding work is extremely important. This article from the development process and present situation of water resources and hydropower project bidding, this paper separately introduces the characteristics of bidding and contract system in China and its significance, basic conditions and requirements of the tender, tender method several aspects, such as choice, thus summarizes a series of bidding are faced with the problem, finally put forward the corresponding countermeasures to solve these problems.
作者 郑修军
出处 《工程建设与设计》 2013年第11期126-128,共3页 Construction & Design for Engineering
关键词 水利水电工程 招标问题 解决对策 water conservancy andhydropowcr engineering thcbiddingproblcrn countermeasures
  • 相关文献

参考文献5

二级参考文献13

共引文献26

同被引文献4

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部