摘要
质量与进度是工程建设的灵魂,本文结合南水北调衬砌工程,分析了影响大型渠道衬砌质量和进度的主要因素,提出了相应的控制方法,为今后大型渠道衬砌施工质量、进度控制提供参考。
The quality and progress are critical for project construction. Major factors affecting large channel lining quality and process are analyzed by combining with lining project in South-to-North water diversion, and corresponding control methods are proposed in the paper, thereby providing reference for controlling construction quality and progress of large channel lining construction in the future.
出处
《水利建设与管理》
2013年第10期27-28,66,共3页
Water Conservancy Construction and Management
关键词
渠道衬砌
质量
进度
控制
channel lining
quality
progress
control