Structural Safety Analysis of Baihe Power Generation Tunnel
下载PDF
导出
摘要 密云水库白河发电隧洞在0+104~0+130、0+147~0+159、0+207~0+237三段存在设计配筋量不足,后经回填灌浆和固结灌浆处理,在运行过程中发现实际外水压力比设计外水压力小;水轮机导叶关闭时间比设计短,引起的水击比设计高。本文对原设计、施工、加固资料进行了整理,对白河发电隧洞结构安全进行了分析。 Miyun Reservoir Baihe Power Generation Tunnel had insufficient reinforcement quantity in design at three sections of 0 + 104 - 0 + 130, 0 + 147 - 0 + 159 and 0 + 207 ~ 0 + 237. It underwent backfill grouting and consolidation grouting process. It was discovered in operation process that the actual external water pressure was lower than the designed external water pressure. The closing time of turbine guide vane was shorter than design, and the subsequent water hammer was higher than the design. The original design, construction and reinforcement information are sorted, and the structural safety of Baihe Power Generation Tunnel is analyzed in the paper.
作者 张立涛
出处 《水利建设与管理》 2013年第10期41-43,共3页 Water Conservancy Construction and Management
关键词 白河发电隧洞 加固 结构安全 Baihe Power Generation Tunnel reinforcement structural safety
  • 相关文献

参考文献3

  • 1林继镛.水工建筑物[M].北京:中国水利电力出版社.2006.
  • 2密云水库管理处.密云水库建库50周年论文汇编[G].
  • 32010清华大学.密云水库安全检查报告[R].1996.

共引文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部