摘要 通过对辽宁电网电源优化配置分析,得出辽宁电网建设抽水蓄能电站的需求空间较大,且省内可供开发的抽水蓄能电站站点较多。今后电网在建设高温高压大容量燃煤火电机组、积极发展新能源的同时,还应加强对省内抽水蓄能电站等调峰电源的开发建设,形成以供热机组和大容量燃煤火电机组承担系统基荷和腰荷,以抽水蓄能电站和水电为主的调峰电源,承担系统峰荷的较为合理的电源结构。 Based on the analysis of power source optimization allocation of Liaoning power network, the demand space of building is the larger and the developed sites are more for the pumped storage power station in Liaoning province. In the future peaking power sources including pumped storage power station should be developed and constructed when the building of the high temperature and high pressure and large capacity coal fired units and developing new energy sources for the power network, which could form the proper power source structure based on the heat supply unit and large capacity coal fired units as the system low load and medium load and the pumped storage power station and hydropower as peak load
出处 《东北水利水电》 2013年第11期1-2,11,共3页 Water Resources & Hydropower of Northeast China
关键词 辽宁电网 抽水蓄能 需求空间 分析 Liaoning power network pumped storage demand space analysis
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部