摘要
主要介绍杭长客专引入长沙南枢纽2种RBC设置方案,通过对这2种RBC设置方案优、缺点的比较、分析,得到最优方案。
The paper introduces mainly the two kinds of RBC setting schemes for accessing HangzhouChangsha dedicated passenger line to Changsha south junction station, and puts forward the best solution through comparing and analyzing the advantages and disadvantages of the two kinds of RBC setting schemes.
出处
《铁路通信信号工程技术》
2013年第5期7-10,25,共5页
Railway Signalling & Communication Engineering
关键词
长沙南枢纽
客运专线
RBC设置方案
Changsha south junction station
dedicated passenger line
RBC setting scheme