摘要
本文介绍在干旱地区建设的超临界间接空冷"三塔合一"大型散热设备的安装工艺,此工艺不仅提高散热设备吊装效率和安装质量而且缩短安装工期,达到降本增效的目的。
This article introduces the supercritical indirect air cooling "three tower integration" large cooling device installation technology constructed in the arid region. This technology can not only improve the lifting efficiency of the cooling device and the installation quality, but also shorten the working time, so that the cost can be reduced and benefit increased.
出处
《价值工程》
2013年第33期41-42,共2页
Value Engineering
关键词
超临界
间接空冷
“三塔合一”
supercritical
indirect air cooling
"three tower integration"