期刊文献+

施工图设计质量模糊综合评价模型及应用 被引量:2

Fuzzy Comprehensive Evaluation Model for Design Quality of Construction Drawing and Application
下载PDF
导出
摘要 为加强设计阶段的质量管理,客观、科学地评价设计质量,保障工程建设质量,运用模糊数学理论中的最大隶属度原则对工程设计中的施工图设计阶段,建立施工图设计质量模糊综合评价模型,并对某生产厂区技术改造项目进行施工图设计质量评价,结果符合实际,方法简单易行,能够帮助设计人员了解自身的设计质量问题所在,改善设计质量提供参考. In order to strengthen the quality management of the design period, to guarantee the quality of construction projects and to appraise the quality of design objectively and scientifically. It established a fuzzy comprehensive evaluation model to appraise the quality of the detail design with the theory of fuzzy mathematics. The model is applied to appraise a real construction project of some factory. It shows that the results accords with the facts and the method is simple and easy. It can help designers to know the problems in their work, and to provide reference to improve the design quality.
作者 胡丹 周文
出处 《湖北文理学院学报》 2013年第5期22-25,共4页 Journal of Hubei University of Arts and Science
关键词 施工图设计质量 模糊综合评价模型 最大隶属度原则 Design quality of construction drawing Fuzzy comprehensive evaluation model Principle of maximum degree of membership
  • 相关文献

参考文献11

  • 1宇霞.设计阶段质量是建筑工程质量的重要保证[J].低温建筑技术,2009,31(2):120-121. 被引量:2
  • 2FEDERAL FACILITIES COUNCIL. Learning from our building: a state-of-the-practices summary of post-occupancy evaluation[J]. Building Research & Information, 2003, 31(5): 407-411.
  • 3GANN D M, SALTERA J, WHYTE J K. Design quality indicators: tools for thinking[J]. Building Research & Information, 2003, 31(5): 318-333.
  • 4SAXON R. A vision for the construction industry[C]//1st Annual Be Conference. London: The British Library Conference Center, 2002.
  • 5PRASAD SUNAND. Clarifying intentions: the design quality indicator[J]. Building Research & Information, 2004, 32(6): 548-551.
  • 6THOMSON D S, AUSTIN S A, DEVINE-WRIGHT H, et al. Managing value and quality in design[J]. Building Research & Information, 2003, 31(5): 334-345.
  • 7ANN T W YU, GEOFFREY O P SHEN, JOHN KELLY, et al. An investigation of the critical success factor in construction briefing by way of content analysis[J]. Journal of Construction Engineering and Management, 2006(10): 1178-1186.
  • 8沙凯逊.建筑设计质量评价:国际经验的启示[J].建筑经济,2004,25(4):80-83. 被引量:8
  • 9白竣竹.建筑工程质量管理与控制[J].科技资讯,2011,9(29):83-83. 被引量:6
  • 10刘继宗.设计监理浅议[J].建设监理,2006(4):32-34. 被引量:1

二级参考文献7

共引文献13

同被引文献4

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部