结合工程实际情况,本着"安全第一、预防为主、综合治理"的方针,从施工准备、施工过程监控、现场临建管理、检查反馈等方面介绍了具体的管理措施,以确保雨期施工的工程质量,从而确保汛期施工生产的有序进行。
Combining with the actual situation of project, based on the policy of "safety first, prevention first, comprehensive management", this paper introduced the specific management measures from construction preparation, construction process control, on-site temporary management, inspection feedback and other aspects, in order to ensure the engineering quality in rain period, so as to ensure the orderly production construc- tion in flood season.