期刊文献+

关于顺义奥林匹克水上公园赛后利用使用策略的研究 被引量:1

The Post-Olympic Reuse Strategy of Shunyi's Olympic Aquatic Park
下载PDF
导出
摘要 为破解奥运场馆赛后利用难题,顺义奥林匹克水上公园在规划设计之初就借鉴国内外成功经验,运用科学系统的设计理念,使场馆建设既满足了赛时需要,又保证赛后可持续利用。同时,区委区政府积极探讨赛后利用使用策略,不断探索实践,逐步走出了一条不同于其他国家、独具特色的赛后利用之路。 In order to solve the problem of reuse of host game venues, the Olympic Aquatic Park in Beijing's Shunyi District borrowed successful strategies from both home and abroad at the very beginning of its design and planning. The designers of the park utilized a systematic and scientific process to ensure the continual use of the facilities, long after the Olympics had concluded. At the same time, the local district government actively assisted in seeking best practices. As a result, the former Olympic Aquatic Park has a very unique utilization strategy.
出处 《世界建筑》 2013年第8期74-77,129,共4页 World Architecture
关键词 顺义奥林匹克水上公园 赛后利用使用策略 可持续利用 Shunyi Olympic Rowing-Canoeing Park, Postgames utility countermeasures, Sustainable use
  • 相关文献

同被引文献43

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部