摘要
TBM掘进过程中会遇到多种不良地质条件 ,作者根据工程地质资料和TBM施工资料 ,对TBM如何在断层带预测和施工进行论述。
In this paper,the writer holds that the fault zone can be predicted by the surface geologic investigation,deep boring,pilot boring,and day-to-day geologic record when constructing with TBM,and suggests that the pilot boring,consolidation grouting, reinforcement of fault zone and other measures may be adopted according to the condition of the fault zone.
出处
《山西水利科技》
2000年第4期31-32,共2页
Shanxi Hydrotechnics
关键词
断层
TBM施工
工程地质资料
隧洞
TBM Construction Fault Zone Consolidation Grouting Pilot Boring