摘要
温岭埋涵位于引黄南干国际Ⅱ标末端 ,地下水丰富 ,开挖困难 。
The culvert at Wenling lies at the end of International Bid Ⅱ of the YRDP,where there is abundant groundwater causing a great difficulty to excavate.In this paper,the excavation process of foundation pit of the culvert is introduced in detail,including the construction order,construction progress,design modification,factors influencing construction and current situation of construction.