本文根据引黄国际Ⅰ标工程的具体情况 ,合理地选用导爆管起爆法 ,对影响导爆管起爆的因素进行了分析 。
The ignition method by booster is selected according to the concrete condition of International Bid I of the YRDP,the factors influencing the ignition of the booster are analysed,and the optimum arrangement scheme of delay blasting steps of blasting cap for the ignition network is obtained.
出处
《山西水利科技》
2000年第4期41-44,共4页