摘要
本文探讨了给排水、暖通施工阶段,甲方代表应具有的综合素质。介绍了甲方在给排水、暖通施工过程中应当注意的信息管理、设计、施工阶段的问题,以及在给排水、暖通施工阶段,甲方代表应注意的程序和控制要点。
This article explores the fast party representative shall have the overall quality in the drainage and HVAC coastruction phase, and introduces the problem ofinformation management, design and construction phase, as well as the procedures and control points that should be noted.
出处
《城市建筑》
2013年第18期129-129,共1页
Urbanism and Architecture
关键词
给排水
暖通空调
甲方
施工
water supply and drainage, HVAC, first party construction