3Bates J M,Granger C W J.The Combination of Forecasts[J].Operations Research Quarterly,1969,20(4):451-468.
4Hippert H S,Pefreira C E,Souza R C.Neural network for short-term load forecasting:A review and evaluation[J].IEEE Trans.Power System,2001,16(2):44-54.
5Muller K R,Smola A J,Ratsch G,et al.Prediction time series with support vector machines[C].In Proc of ICANN'97.,Springer LNCS 1327,Berlin,1997,999-1004.
6Papadakis S E,Theoeharis J B,Kiartzis S J,et al.A novel approach to short-term load forecasting using fuzzy neural net-works[J].IEEE Trans.Power Systems,1998,13(2):480-492.
7Vapnik V,Golowich S,Smola A Support vector method for functionapproximation,regression estimation,and signal processing[M].Cambridge,MA,MIT Press,1997,281-287.