4Aktas Engin, Moses Fred, Ghosn Michel. Cost and safety optimization of structural design specifications. Reliability Engineering and System Safety. Volume: 73, Issue: 3, September, 2001, pp. 205-212.
5[1]Herroelen W,Reyck B D,Demeulemeester E.Resource-Constrained Project Scheduling:A Survey of Recent Developments[J].Computers Operations Research,1998,25(4):279-302.
6[4]Shtub A,Bard J F,Globerson S.Vroject Management:Processes,Methodologies,and Economies[M].Pearson Education Asia Limited and Tsinghua University Press,2006.