摘要
文章对黄河龙羊峡水电站大坝两岸坝肩岩体中 F71 、F73 、G4、F1 8和 F1 2 0 等断层的水泥灌浆试验成果进行了研究 ,探讨了不同压力下岩体的可灌性 ,对不同主剂的化学灌浆试验进行了总结。
The test results of cement grouting in the faults F 71 ,F 73 ,G 4,F 18 and F 120 in the abutment rockmass of the Longyangxia gravity arch dam are studied.The groutability of foundation rockmass under different pressures is discussed and the chemical grouting tests with different major chemicals are summarized.
出处
《西北水电》
2000年第4期19-24,共6页
Northwest Hydropower
关键词
岩体可灌性
水泥灌浆
化学灌浆
试验
rockmass groutability
cement grouting
chemical grouting
test