摘要 安康水电站混凝土重力坝安全监测系统已运行多年 ,实际运行情况揭露了设计中存在的问题 ,如视准线观测法理论和实践运用的差距 ,大地四边形设计中对通视考虑不足等。电厂经过研究决定 ,对安全监测系统进行更新改造 ,先后对变形监测系统、扬压力监测系统、绕坝渗流系统、静力水准系统等进行了改造 ,效果较好。目前观测系统自动化正在逐步实施。 The safety monitoring system of the gravity concrete dam for the Ankang Hydropower Station has been operated for many years. The actual operation found many problems in the design, such as the difference between the theory and its practice of the collimating line observation method, and the intervisibility problem in the geodetic quadrilateral design. Upon study, the Plant decided to renew and improve the existing safe monitoring system, such as deformation monitoring system, uplift pressure monitoring system, by pass seepage monitoring system, static level system, etc. These systems have been improved and good effectiveness has been gained. At present, the automation of observation system is being gradually implemented.
作者 康有成
机构地区 安康水力发电厂
出处 《水力发电》 北大核心 2000年第11期21-25,共5页 Water Power
关键词 安全监测 混凝土坝 自动化 安康水电站 safety monitoring, concrete dam observation, observation design, rehabilitation, observation automation, Ankang Hydropower Station
  • 相关文献

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部