摘要
四川汶川地震后,灾区高校图书馆在馆舍、文献资源、设备设施等方面得到较好的恢复重建,但也存在着片面强调新馆舍抗震功能、大量集中采购和忽视图书馆人才建设等问题。本文针对这些问题提出了解决的具体对策。
After Wenchuan Earthquake, the libraries premises, literature resources, equipment facilities in disaster area have recovered and recon- structed well. But some issues are also existing, including one-sided emphasis on earthquake resistant construction of new premises, group centralized purchasing and ignorance of librarian talent construction. In order to solve these issues, detailed measures are put forwarded for future similar recovery and reconstruction.
出处
《图书馆工作与研究》
CSSCI
北大核心
2013年第11期106-108,共3页
Library Work and Study
关键词
高校图书馆
地震
灾后重建
对策
Academic library
Earthquake
Post-disaster reconstruction
Measures