期刊文献+

无锡地铁1号线西漳车辆段雨水泵站设计

Design of Stormwater Pumping Station at Xizhang Metro Depot for Wuxi Metro Line No. 1
原文传递
导出
摘要 无锡市地铁1号线西漳车辆段雨水泵站是在用地紧张、环境要求高的条件下设计建造的。泵站在满足工艺要求的前提下,充分考虑了设备的隐蔽化设计,合理利用泵站上部空间,泵站建筑设计与整体环境协调一致,从工艺设计、总体布置、设备优化、建筑设计等方面进行了探讨。 Stormwater pumping station at Xizhang metro depot for Wuxi metro line No. 1 was designed and built under the conditions of land shortage and high environmental requirements. In the design, the technological requirements were met, the concealed design of equipment was taken into account, the three-dimensional space was rationally used, and the pumping station building design was co- ordinated with the overall environment. The process design, overall layout, equipment optimization, ar- chitectural design were discussed.
出处 《中国给水排水》 CAS CSCD 北大核心 2013年第22期87-90,共4页 China Water & Wastewater
关键词 雨水泵站 设备优化 隐蔽化设计 stormwater pumping station equipment optimization concealed design
  • 相关文献

参考文献3

二级参考文献3

共引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部