近距离大断面暗挖隧道下穿老旧民房施工技术

The construction technology of short distance large undercut tunnel down-traversing the old civil houses
下载PDF
导出
摘要 结合北京地铁6号线南锣鼓巷站主体暗挖段施工实例,介绍了近距离大断面暗挖隧道在复杂地层中下穿危旧民房的施工方法和技术措施。研究在不同施工阶段的受力和影响分析,针对复杂的结构形式、地层围岩条件、施工工况和施工方法,总结施工过程安全控制和关键技术。 Combined the construction examples nanluogu xiang station of Beijing metro line 6 is the main body under- ground , this paper introduces the close of underground run- ning tunnel in complex formation and lower wear dangerous old houses construction methods and technical measures, re- searchs in different construction stages of the stress and im- pact analysis, in view of the complicated structure form, for- mation conditions, construction conditions and construction method of surrounding rock, summarizes the key technology and safety control in the construction process.
作者 刘少雨
出处 《山东交通科技》 2013年第5期18-20,共3页
关键词 地铁暗挖隧道 下穿民房 施工技术 the subway underground running tunnel un-der wear houses the construction technology
  • 相关文献

参考文献3

二级参考文献1

  • 1厉本芹 钟世航.双线黄土隧道复合式衬砌接触应力和喷层应变.隧道及地下工程学会第八届年会论文集[M].,1994,10..

共引文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部