摘要
以内蒙古西部某风电项目二期工程为例,提出打破以风电机组电机容量等级划分风机轮毂高度的旧有观念,面向发电能力最优的设计理念。通过将一期工程风电机组的轮毂高度由65m提升至70m,20年总收益提高1354万元,实现了风电场最佳投资收益。
by a certain wind power project phase ii project of west Inner Mongolia as an example,put forward to break the wind generator to motor capacity fan hub height of the old concept hierarchies,the optimal capacity oriented design concept.By a phase of the wind turbine hub height from 65 m to 70 m,20 years total revenue increase of 13.54 million yuan,achieve the wind best investment returns.
出处
《内蒙古石油化工》
CAS
2013年第11期78-80,共3页
Inner Mongolia Petrochemical Industry