摘要
在我国经济高速增长的情况下,工程建设的节奏越来越快,有的工程从接受任务开始,不到一周就要提交最终测绘成果,使用常规的GPS测量技术是办不到的。而目前的VRS技术能够大幅度减少作业人员、缩短作业时间、提高工作效率,把一周内提交最终测绘成果变成现实。文中结合南汇东滩促淤一期工程工前施工控制测量实例,分析总结了VRS技术在作业中的优缺点。
Construction rhythm is faster and faster in the rapid economic growth in China's case,and some engineering starts from the acceptance of the task,less than a week to submit the final results of surveying and mapping.It is impossible using routine GPS measurement techniques.At presenl,the VRS technology can greatly reduce the operating personnel,shorten the working time,improve work efficiency,and achieve submit the final results of surveying and mapping in a week.In the paper,the author analyzes and summarizes the advantages and disadvantages of VRS technology in the operation combining with Nanhui Dongtan control measure example construction siltation one phase of the project before work.
出处
《矿山测量》
2013年第5期50-51,89,共3页
Mine Surveying