期刊文献+

地质雷达探测底板破坏深度的数值模拟研究 被引量:8

Numerical simulation research on damage depth of floor based on GPR detection
下载PDF
导出
摘要 针对李家壕煤矿近距离煤层群同采工程背景,为了探究上位2-2中煤层开采对下位3-1#煤层顶板的影响深度,首先采用理论公式计算出影响深度为18.01m,然后通过现场使用地质雷达探测,得到影响深度为22m,最后通过FLAC3D数值模拟分析得出2-2中煤层推进80m的底板最大塑性区为20m,理论计算、数值模拟和地质雷达测试结果基本一致。 Aiming at the situation of simultaneous mining in close-distance seam group in Li- jiahao Mine, in order to explore the influence depth of upper 2--2 seam mining to the lower 3--1 coal seam, the paper, firstly, calculates the influence depth is 18.01m by the theoretical formula, and then gets the damage depth is 22m through on-site GPR detection, and finally, with the FLAC3D numerical simulation analysis it works out that the maximum floor plastic zone is 20m when 2--2 middle seam moving ahead 80m. The results of theoretical calculation and numerical simulation are basically consistent with that of GPR detection.
出处 《中国煤炭》 北大核心 2013年第11期51-54,共4页 China Coal
基金 国家重点基础研究计划(973)西部煤炭高强度开采下地质灾害防治与环境保护基础研究(2013CB227900)
关键词 近距离煤层群开采 同采工作面 地质雷达 破坏深度 FLAC3D数值模拟 close-distance coal seam group mining, simultaneous mining faces, GPR, damage depth, FLAC3D numerical simulation
  • 相关文献

参考文献6

二级参考文献9

共引文献195

同被引文献157

引证文献8

二级引证文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部