湖南省矿山地质环境保护项目管理研究
摘要
本文针对湖南省矿山地质环境保护项目特点,就如何进一步强化矿山地质环境保护项目管理展开研究。
出处
《国土资源导刊》
2013年第10期54-56,共3页
Land & Resources Herald
参考文献2
-
1尹贻林,钟炜,苏永青.基于可持续发展理论的灾后恢复重建项目管理模式研究——陕西省略阳县地震灾区天津市对口支援实践[J].科技进步与对策,2009,26(21):121-124. 被引量:4
-
2宋旭光,庞明川,王晓玲,严绍兵,吕怀涛,万丛颖,刘畅,郭晓丹,刘丹丹.重大自然灾害灾后重建的政策框架与政策体系--以汶川地震为例[J].财经问题研究,2008(9):10-18. 被引量:19
二级参考文献12
-
1谢礼立.城市防震减灾能力的定义及评估方法[J].西北地震学报,2005,27(4):296-304. 被引量:19
-
2Topping, Kenneth C. A model Recovery and Reconstruction Ordinance. Planning for Post - Disaster Recovery and Reconstruction [ M]. Schwab, Jim, ed. Chicago, Illinois: American Planning Association, Planning Advisory Service Report 483/484. 1998, 149 - 167.
-
3Berke, Philip R. , Kartez, Jack and Wenger, Dennis. Recovery after Disaster: Achieving Sustainable Development, Mitigation and Equity [J]. Disasters, 1993, 17(2) :93 - 109.
-
4Comerio, Mary C. Disaster Hits Home: New Policy for Urban Housing Recovery [ M ]. Berkeley: University of California Press, 1998. 300.
-
5Arnold, Christopher. 1993. Reconstruction After Earthquakes: Issues, Urban Design, and Case Studies [ R ]. Report to National Science Foundation, Building Systems Development, Inc. , Palo Alto, California.
-
6Smith, Richard A. and Deyle, Robert E. Hurricane Case Study: Opal in the Florida panhandle. Planning for Post - Disaster Recovery and Reconstruction [M]. Schwab, Jim, ed. Chicago, Illinois: American Planning Association, Planning Advisory Service Report 483/484. 1998, 235 -259.
-
7Eadie, Charles C. Earthquake case study: Loma Prieta in Santa Cruz and Watsonville, California. Planning for Post - Disaster Recovery and Reconstruction [ M]. Schwab, Jim, ed. American Planning Association, Planning Advisory Service Report 483/484, Chicago, Illinois 1998,281 - 310.
-
8Haas, J. Eugene, Robert W. Kates and Martyn J. Bowden, ed. Reconstruction Following Disaster [ M ]. Cambridge, Massachusetts : MIT Press, 1977.
-
9Rubin, C. B. The community recovery process in the United States after a major natural disaster [J].International Journal of Mass Emergencies and Disasters, 1985, (3) : 9 - 28.
-
10Johnson, Laurie. Empowering I_ocal Governments in Disaster Recovery Management: lessons from Watsonville and Oakland in Recovering from the 1989 Lorna Prieta Earthquake and Other Recent Disasters[J].Lessons Learned Over Time ,1999 , Volume I:117.
共引文献21
-
1郭剑平.从汶川地震看我国自然灾害救助体系的健全[J].河海大学学报(哲学社会科学版),2009,11(1):29-31. 被引量:10
-
2陈艺,王健.汶川地震灾后安置点的社区化管理思考与对策——以成都市为例[J].理论与改革,2009(3):96-99. 被引量:2
-
3陈艺.灾后安置点社区重建中的社区化管理——以成都市为例[J].电子科技大学学报(社科版),2009,11(4):81-84.
-
4李公祥,尹贻林,周金娥.灾后重建保障性公共项目快速建设机制研究[J].软科学,2009,23(12):1-4. 被引量:3
-
5王健,徐睿,陈艺.灾后重建中群众的主体作用——由成都经验引起的几点思考[J].中共四川省委省级机关党校学报,2009(4):66-69. 被引量:1
-
6尹贻林,万礼锋.汶川地震灾后恢复重建保障性公共项目绩效规划研究[J].科学学与科学技术管理,2010,31(3):128-133. 被引量:1
-
7尹贻林,苏永青,钟炜.灾后重建保障性公共项目投资控制体系的探讨——以天津对口支援略阳灾后恢复重建实践为例[J].建筑经济,2010,31(6):65-68. 被引量:2
-
8尹琳琳,尹贻林.基于绩效管理的灾区重建项目管理模式研究[J].西安电子科技大学学报(社会科学版),2010,20(4):33-38. 被引量:2
-
9那保国,何志毅.基于CSR视角的“一企一村”农村灾后重建资金筹集模式研究[J].农村经济,2011(11):61-64. 被引量:2
-
10张睿.灾后重建项目的公众参与机制探讨[J].项目管理技术,2012,10(5):68-72. 被引量:1