期刊文献+

铜陵公铁两用长江大桥斜拉索锚固参数设计研究 被引量:8

Study of Anchoring Parameters Design for Stay Cables of Tongling Changjiang River Rail-cum-Road Bridge
下载PDF
导出
摘要 铜陵公铁两用长江大桥为主跨630m的钢桁梁斜拉桥,斜拉索为三索面平行钢绞线拉索。为使该桥斜拉索的设计锚固参数精确可靠,从钢绞线斜拉索的构造、设计原理、各影响因素等方面进行研究。研究表明:钢绞线斜拉索虽在索体构造上不同于平行钢丝斜拉索,但实际锚固点是一致的;锚固参数设计时,成桥索力应按推导水平力用的水平角准确采用,应计入主梁预拱度的影响,桥塔预偏不大时可忽略。 The Tongling Changjiang River RailcumRoad Bridge is a steel truss girder cable stayed bridge with a main span of 630 m. The stay cables composed of parallel steel strands are ar ranged in three cable planes. To ensure that the stay cable anchoring parameters designed for the bridge are accurate and reliable, the study was carried out from aspects of the composition, design principles and influencing factors of the stay cables made of steel strands. The results of the study show that the stay cables made of steel strands, in terms of composition, are different from those made of parallel steel wires, but the actual anchoring points of them are the same. When the an choring parameters are designed, the cable forces in the complete bridge state must be applied ac curately according to the horizontal angles used for the derivation of the horizontal forces, the im pact of the precamber of the main girder must be considered, but when the preoffsetting of the bridge pylon is not too big, the precamber of the main girder can be ignored.
作者 李伟 张强
出处 《世界桥梁》 北大核心 2013年第6期67-71,共5页 World Bridges
关键词 公路铁路两用桥 斜拉桥 斜拉索 钢绞线 锚固 参数 rail-cum-road bridge cable-stayed bridge stay cable steel strand anchoring pa-rameter
  • 相关文献

参考文献9

二级参考文献23

共引文献170

同被引文献60

引证文献8

二级引证文献106

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部