期刊文献+

秀山电网潮流分析与运行优化策略

Analysis of Power Flow and Strategy of Operation Optimization For Xiushan Grid
下载PDF
导出
摘要 针对秀山电网的现状,对整个电网进行了潮流计算,结果发现:电网存在潮流分布不均的情况,部分变电站严重过载,变压器负载率达到100%,由此导致电网局部运行极不稳定。基于上述问题,提出了秀山电网的优化运行方案,通过采取负荷转移结合电网建设的方式来控制潮流的流向,使功率得到合理分配。结果表明,能够有效改善变压器重载及过载现象,提高了供电的可靠性,同时为秀山电网的进一步规划建设提供了参考。 In view of the current situation of Xiushan power grid, we calculate the power flow of the entire grid, and found that the power flow uneven distribution in the grid has caused serious overload in some transformer substations, with the load rate reaching 100%, thus leading to the extreme instability of the local grid. To address the above issues, this paper proposes the an operation optimization scheme of Xiushan grid, which adopts the load transfer method in combination with grid constnlction to control the flow direction, so as to make the power distribution reasonable. The result shows that, this scheme can effectively improve the transformer heavy load and overload, enhance the reliability of power supply, and at the same time provides a reference for further planning and construction of Xiushan grid.
出处 《电气自动化》 2013年第5期70-72,75,共4页 Electrical Automation
关键词 秀山 电网运行 潮流计算 优化 变压器重载及过载 xiushan grid grid operation power flow optimization scheme
  • 相关文献

参考文献6

二级参考文献29

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部