摘要
针对某电厂600 MW机组协调控制在煤种变化较大时,CCS投入效果较差的情况下,结合本机组的特性,提出了详实合理的CCS优化方案。
Aiming at the situation that CCS had poor effects when the type of coal was changed in 600 MW unit coordination control in a power plant, and combined with the character of this unit, this paper proposed detailed and reasonable prioritization scheme of CCS.
出处
《贵州电力技术》
2013年第11期22-24,共3页
Guizhou Electric Power Technology
关键词
600
MW机组
协调控制
前馈
600 MW unit
coordination control
feed-forward