期刊文献+

Two-echelon inventory model with service level constraint and controllable lead time sensitive to order quantity 被引量:3

Two-echelon inventory model with service level constraint and controllable lead time sensitive to order quantity
下载PDF
导出
摘要 The decision-making and optimization of two-echelon inventory coordination were analyzed with service level constraint and controllable lead time sensitive to order quantity.First,the basic model of this problem was established and based on relevant analysis,the original model could be transformed by minimax method.Then,the optimal order quantity and production quantity influenced by service level constraint were analyzed and the boundary of optimal order quantity and production quantity was given.According to this boundary,the effective method and tactics were put forward to solve the transformed model.In case analysis,the optimal expected total cost of two-echelon inventory can be obtained and it was analyzed how service level constraint and safety factor influence the optimal expected total cost of two-echelon inventory.The results show that the optimal expected total cost of two-echelon inventory is constrained by the higher constraint between service level constraint and safety factor. The decision-making and optimization of two-echelon inventory coordination were analyzed with service level constraint and controllable lead time sensitive to order quantity. First, the basic model of this problem was established and based on relevant analysis, the original model could be transformed by minimax method. Then, the optimal order quantity and production quantity influenced by service level constraint were analyzed and the boundary of optimal order quantity and production quantity was given. According to this boundary, the effective method and tactics were put forward to solve the transformed model. In case analysis, the optimal expected total cost of two-echelon inventory can be obtained and it was analyzed how service level constraint and safety factor influence the optimal expected total cost of two-echelon inventory. The results show that the optimal expected total cost of two-echelon inventory is constrained by the higher constraint between service level constraint and safety factor.
出处 《Journal of Central South University》 SCIE EI CAS 2013年第11期3324-3333,共10页 中南大学学报(英文版)
基金 Project(71102174,71372019)supported by the National Natural Science Foundation of China Project(9123028)supported by the Beijing Natural Science Foundation of China Project(20111101120019)supported by the Specialized Research Fund for Doctoral Program of Higher Education of China Project(11JGC106)supported by the Beijing Philosophy&Social Science Foundation of China Projects(NCET-10-0048,NCET-10-0043)supported by the Program for New Century Excellent Talents in University of China Project(2010YC1307)supported by Excellent Young Teacher in Beijing Institute of Technology of China
关键词 库存模型 服务 双级 敏感 可控 订购 极小极大方法 service level constraint safety factor controllable lead time sensitivity to order quantity two-echelon
  • 相关文献

参考文献24

  • 1PINE B. Mass customization: the new frontier in business competition [M]. Boston, USA: Harvard Business School Press, 1993: 6-8.
  • 2JHA J K, SHANKER K. Two-echelon supply chain inventory model with controllable lead time and service level constraint [J]. Computers & Industrial Engineering, 2009, 57: 1096-1104.
  • 3LIAO C J, SHYU C H. An analytical determination of lead time with normal demand [J]. International Journal of Operations & Production Management, 1991, lh 72-78.
  • 4OUYANG L Y, YEH N C, WU K S. Mixture inventory model with backorders and lost sales for variable lead time [J]. Journal of the Operational Research Society, 1996, 47: 829-832.
  • 5MOON i, CHOI S. A note on lead time and distributional assumptions in continuous review inventory models [J]. Computers & Operations Research, 1998, 25: 1007-1012.
  • 6BEN-DAYA M, HARIGA M. Lead-time reduction in a stochastic inventory system with learning consideration [J]. International Journal of Production Research, 2003, 41:571-579.
  • 7RYU S W, LEE K K. A stochastic inventory model of dual sourced supply chain with lead-time reduction [J]. International Journal of Production Economics, 2003, 11 : 513-524.
  • 8OUYANG L Y, WU K S, HO C H. Integrated vendor buyer cooperative models with stochastic demand in controllable lead time [J]. International Journal of Production Economics, 2004, 92: 255- 266.
  • 9BEN-DAYA D M, HARIGA M. Integrated single vendor single buyer model with stochastic demand and variable lead time [J]. International Journal of Production Economics, 2004, 92:75 -80.
  • 10SONG H M, YANG H, LUO J Q. Optimal ordering policy and coordination mechanism of a supply chain with controllable lead-time-dependent demand forecast [J]. Mathematical Problem in Engineering, 2011. doi: 10.1155/2011/985104.

同被引文献19