摘要
本文对云南金沙江鲁地拉水电站水轮机蜗壳的拼装、挂装、焊接等施工工艺进行了介绍,并对相关问题作了分析研究总结,以期对其他同类型电站的大型混流式水轮发电机蜗壳安装提供指导和借鉴。
The construction technologies of assembling, hanging and welding hydrogenerator volute in Yunnan Jinsha River Ludila Hydropower Station are introduced. Relevant problems are analyzed, studied, and summed up, and it is expected that the paper can provide guidance and reference for installing large mixed-flow hydrogenerator volutes in other similar hydropower stations.
出处
《中国水能及电气化》
2013年第11期32-35,共4页
China Water Power & Electrification
关键词
鲁地拉水电站
蜗壳
安装
焊接
施工工艺
Ludila Hydropower Station
volute
installation
welding
construction technology