深基坑施工中地下室夹层缺失区的特殊处理

Special Treatment of Basement-Interlayer-Deficiency Areas during Deep Foundation Pit Construction
下载PDF
导出
摘要 针对悦合国际广场深基坑工程中部分区域无地下一层夹层,支护设计第二道支撑采用双围檩后拆除方式,需研究双围檩过墙施工、第二道支撑上楼面模板支撑的调整、第一、二道支撑的拆除等一系列特殊技术处理,本文进行了详细分析与阐述。重点研究了地下室夹层缺失区的特殊技术处理过程与应用,为今后类似的深基坑施工中有地下室夹层缺失区的情况提供参考与借鉴作用。 The Thesis has detailed analysis and statement of dismantling of the second support after dual purlines are used in the support design, and research on double purline over-the-wall-construction, adjustment of floor template support on the second support, dismantling of the first and second supports, and other serial special treatment technologies against the ground floor interlayer-deficiency in some areas of the deep foundation pit project of Yuehe International Plaza. Special technical treatment process of the basement-interlayer-deficiency areas and its application are mainly researched so as to provide reference for the situation with similar basement- interlayer-deficiency areas during deep foundation pit construction.
作者 崔名山
出处 《住宅科技》 2013年第11期57-60,共4页 Housing Science
关键词 深基坑 地下室夹层缺失 施工技术 应用研究 deep foundation pit, basement-interlayer-deficiency, construction technology, application research
  • 相关文献

参考文献4

  • 1刘国彬;王卫东.基坑工程手册(第二版)[M]北京:中国建筑工业出版社,2009.
  • 2史家堉.建筑物爆破拆除理论与实践[M]北京:中国建筑工业出版社,2010.
  • 3上海建工集团股份有限公司.深基坑工程施工技术[M]上海:上海科学技术出版社,2012.
  • 4周兆平.大型商业中心深基坑综合施工技术[J].建筑施工,2013,35(5):357-359. 被引量:10

二级参考文献5

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部