摘要
分析了娘子关电厂 3#炉大修后试运行过程中发生炉内结渣的原因 ,介绍了通过燃烧调整解决炉内结渣和低负荷不投油稳燃的经验 。
The cause of furnace slagging of No.3 of Niangziguan Power Plant during its priliminary operation after major repair is analyzed.The successful experience to prevent furance slagging and make the boiler operate with stable combustion without supporting oil at low load through burning regulation is introduced.it may be provided as a reference for burning regulation of the same type boiler.
出处
《电力学报》
2000年第3期215-217,219,共4页
Journal of Electric Power
关键词
锅炉
结渣
燃烧调整
电厂
boiler
furnace slagging
burning regulation