江阴长江公路大桥钢箱梁制造的进度控制 被引量:3

Control of Progress Schedule of the Manufacture of Steel Box Girders of Jiangyin Changjiang Highway Bridge
下载PDF
导出
摘要 进度控制是工程建设项目中与质量、投资控制并列的三大控制之一。江阴大桥钢箱梁的组装与焊接是江阴大桥实体形成的主要阶段 ,对其进度实施动态控制 ,是保证钢箱梁制造满足大桥建设总进度要求的重要手段。主要介绍江阴大桥梁段制造。 The control of progress schedule is one of three major controls, in equal position with the quality control and investment control. Assembling and welding of the steel box girders is an important construction stage in forming the proper part of the major bridge. The dynamic control of its progress is an important measure to insure the fulfillment of the requirement of construction progress of the whole bridge. This paper describes how the progress schedule is controlled in manufacturing and assembling of the segments of the bridge girder.
出处 《桥梁建设》 EI CSCD 北大核心 2000年第4期35-37,41,共4页 Bridge Construction
关键词 钢箱梁 进度控制 公路桥 施工组织 制造 changjiang river bridge, suspension bridge, steel girder, box girders,manufacturing technology, construction organization
  • 相关文献

同被引文献16

引证文献3

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部