摘要
根据某火电厂湿法烟气脱硫废水水质水量情况,详细介绍了废水处理的工艺流程和主要设备,对系统进行了调试,处理后出水水质达到《火电厂石灰石-石膏湿法脱硫废水水质控制指标》(DL/T997-2006)排水标准。
According to the quality and quantity of wastewater from flue gas desulfurization process in power plants, the technological process and main equipments of wastewater treatment were introduced, the treatment system was debugged. The results show that treated wastewater can reach to the level of "Discharge standard of wastewater from limestone-gypsum flue gas desulfurization system in fossil fuel power plants" (DL/T997--2006).
出处
《辽宁化工》
CAS
2013年第11期1314-1316,共3页
Liaoning Chemical Industry
关键词
火电厂
烟气脱硫
废水处理
power plant
flue gas desulfurization
wastewater treatment