摘要
介绍2座特大型高炉供电设计中的负荷计算、系统接线、设备选型、消防、直流电源、计算机后台管理系统的配置、电缆敷设方式,以及TRT发电机的控制与保护。
The design of power supply of two especially big blast furnace from aspects of load calculation, system wiring, equipment selection, fire protection, DC power supply, management and configuration of computer background system, cable laying methods and control and protection of TRT power generator are introduced.
出处
《自动化应用》
2013年第11期85-87,共3页
Automation Application